Advanced Work Packaging (AWP) · CWP · IWP

Construction Work Packages Built for Foremen, Not File Folders.

We translate design models and engineering drawings into constraint-free, field-ready work packages. Delivered directly into Procore, InEight, or whatever platform your organization uses, on your working day.

01 / The Field Reality

Why work packaging breaks down on mid-size industrial jobs

When contractors don't have dedicated technical services staff, work packaging falls onto field superintendents after hours or gets bypassed entirely:

▪

Crews standing by while runners search for missing valves, gaskets, or hardware.

▪

Outdated isometric revisions built on site because nobody managed drawing control.

▪

Hydrostatic test packages scrambled together at mechanical completion.

02 / The Concrete Deliverables

What your project team actually receives

01

CWP / IWP Breakdown Structures aligned to Construction Work Areas and priority schedule logic.

02

Complete, Self-Contained IWPs — scope narrative, marked isometrics, BOM, take-offs, QC forms.

03

Model-Based Scope Visualization — package boundaries isolated and color-coded in Navisworks/Revit.

04

Constraint Tracking & Release Logs so unready packages are never issued to the field.

05

Hydrostatic & Pneumatic Test Packages — test boundaries, blind lists, turnover QC forms.

06

Constructability & RFI Drafting — clash detection on screen, RFIs ready for signature.

03 / Technical Standards

MethodologyConstruction Industry Institute (CII) AWP Best Practices
Industry codesASME B31.1, B31.3, Section VIII/IX · ACI · AISC
PlatformsProcore · InEight · Navisworks · Revit · AutoCAD · Bluebeam Revu — and any CDE, ERP, or model platform your project uses

04 / Low-Friction Entry

How to test our packaging capability: The Single-CWA Pilot

The scopeSelect a single Construction Work Area or a defined piping/structural scope.
The outputA fixed number of complete IWPs, model sets, take-offs, and constraint logs by an agreed date.
The termsFixed lump-sum price, standard NDA and U.S. contracting.

05 / Next Step

Schedule an AWP pilot discussion.

One Construction Work Area, a fixed number of packages, a fixed price. Judge the model by what arrives on your foreman's desk.