Module Fabrication Yard — Mexico
| Context | International EPC Contractor during major restructuring |
|---|---|
| Role | Technical Services Manager |
| Scope | AWP implementation, technical RFIs, MOC, mechanical completion, load-out coordination |
Portfolio Hub · Company Remote Delivery & Founder Field Track Record
A clear view of our remote technical execution for U.S. industrial contractors, backed by over 15 years of major project leadership on site.
01 / Flagship Company Engagement — Remote Execution
Company Delivery · Remote · U.S. Project
The project challenge
The contractor faced rigorous Advanced Work Packaging mandates and required full InEight ERP implementation across complex piping systems. The site team lacked the bandwidth to build hundreds of detailed IWPs and manage drawing revision control at the component level.
The TSC delivery scope
AWP. Authored and maintained 250+ complete IWPs with scope narrative, IFC isometric sets, BOM, and QC checklists.
Peak production. Sustained 25–30 complete IWPs per week at peak periods.
InEight ERP. Loaded quantities, configured credit rules, established automated reporting.
Spool-level control. Granular tracking across fabrication, erection, and testing.
Test program. Assembled hydrostatic test packages directly inside Procore and InEight.
The quantified results
Why it proves the model
Three nearshore engineers ran the technical services function of a major U.S. piping scope inside the client's own platforms, in the same time zone, for two continuous years. No on-site footprint, no travel overhead, zero lag in communication.
02 / Founder Leadership Track Record — On-Site
Founder Track Record · On-Site · Not Company Delivery
Field leadership executed personally by our Managing Director before TSC. Shown separately, on purpose: it governs our standards — it is not remote company delivery.
| Context | International EPC Contractor during major restructuring |
|---|---|
| Role | Technical Services Manager |
| Scope | AWP implementation, technical RFIs, MOC, mechanical completion, load-out coordination |
| Context | Large-scale industrial refinery expansion program |
|---|---|
| Role | Construction Superintendent & QA/QC Management |
| Scope | +14,000 auger-cast piles, drainage, earthworks, subcontract supervision |
03 / Portfolio Call to Action